X hits on this document

172 views

0 shares

0 downloads

0 comments

43 / 45

TOYOTA Procedure

Issue: B

10/20/07

FJ CRUISER

MY – 2007-

SUPERCHARGER FIT KIT

(ii) Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

(iii) Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine.

  • (d)

    Check the air intake system to ensure there are no leaks and for tightness.

  • (e)

    Stop the engine and wait for the coolant to cool down.

  • (f)

    Carefully remove the radiator cap and check the coolant level inside the radiator and add coolant if necessary. Reinstall the radiator cap.

  • (g)

    Check the coolant level inside the radiator reservoir. If it is below the full level, add coolant.

  • (h)

    Check the coolant in the intercooler reservoir and add coolant if necessary.

  • (i)

    Drive test the vehicle. If all is okay, park and proceed with the next step. If not, troubleshoot as necessary.

  • (j)

    Use the diagnostic Techstream tool to check for ECU error codes.

  • (k)

    Place the Supercharger noise Mirror hanger card (L7) on the inside rearview mirror.

  • (l)

    Complete and mail the warranty registration card (L6). Note: The installation of the Supercharger is not complete until this card has been returned to TRD.

  • (m)

    Place all removed factory hardware, components, and this instruction sheet into the original TRD kit box and give it to the customer and or place it in the vehicle cargo compartment.

Page 43 of 45 pages

Document info
Document views172
Page views173
Page last viewedFri Dec 09 13:46:36 UTC 2016
Pages45
Paragraphs1344
Words8482

Comments