X hits on this document

PDF document

September 1999 P/N 880-503284-001-A1 - page 15 / 65

170 views

0 shares

0 downloads

0 comments

15 / 65

Chapter

2

Quick Set-Up

This section details a quick, step-by-step procedure for configuring the NCC 2020. For this quick configuration guide, the following assumptions are made:

That you are using the NCC 2020 with a single DIU 2130 DSU module in a Dual-line shelf.

That you are dividing the bandwidth of an ESF/B8ZS T1 evenly between the two data ports of the DIU 2130.

That one of the data ports is used for a router and the other data port is for a time-division multiplexer.

Figure 2-1

Example Configuration

Dual-line Shelf

Router

NCC 2020

DIU 2130

Network Service Provider

Time Division Multiplexer

It is most likely that this procedure will not match your configuration exactly. Use this chapter as a guide to the process of installing your equipment. Chapter 3 provides complete details on configuration covering all selectable options.

Connect to Craft Port

Using the Craft cable supplied with the NCC 2020, connect the modular (RJ-11) end to the port labeled CRAFT on the front panel of the NCC 2020. Connect the other end of the Craft cable to your PC or terminal. If your PC has a DB-9 COM port connector, use a standard PC-AT serial cable to complete the connection.

Set your terminal, or terminal program, to 19.2 kbit/s, 8 data bits, no parity, one stop bit, and no flow control.

Verilink NCC 2020 User Manual

2-1

Document info
Document views170
Page views170
Page last viewedFri Dec 09 08:12:03 UTC 2016
Pages65
Paragraphs3233
Words20026

Comments