X hits on this document

PDF document

September 1999 P/N 880-503284-001-A1 - page 21 / 65

195 views

0 shares

0 downloads

0 comments

21 / 65

Quick Set-Up

The remaining options are correct for this example. The T1 circuit and DTE should now be connected.

Once the CSU has been connected to the T1 circuit for at least fifteen minutes, meaningful performance statistics will be available under the Performance Menu. See Chapter 4 for more details.

Within 15 seconds of connecting the T1 circuit, the NET LED on the front of the NCC 2020 should change from red to green. If it does not, the Diagnostics Menu may be used for troubleshooting. See Chapter 5 for more information on diagnostics.

For more information on DIU 2130 modules see the DIU 2130 User Manual.

The configuration options for the NCC 2020 are covered in detail in Table 3-4, in Chapter 3 of this manual.

Verilink NCC 2020 User Manual

2-7

Document info
Document views195
Page views195
Page last viewedTue Jan 17 11:50:26 UTC 2017
Pages65
Paragraphs3233
Words20026

Comments