X hits on this document

125 views

0 shares

0 downloads

0 comments

25 / 38

Section 6.01.01 Direct Costs Direct costs are those that can be identified specifically with a particular final cost objective of the organization.  Direct costs charged to a DSHS program attachment are those costs attributable in carrying out the program attachment’s Statement of Work as specified in the contract and can be directly assigned relatively easily with a high degree of accuracy. Source: DSHS Contractor’s Financial Procedures Manual

Document info
Document views125
Page views125
Page last viewedThu Jan 19 18:03:31 UTC 2017
Pages38
Paragraphs97
Words2537

Comments