X hits on this document

PDF document

Sample Specifications for Rosco Subfloor System – - page 8 / 8

23 views

0 shares

0 downloads

0 comments

8 / 8

  • 3.

    Install perimeter blocking using powder actuated fasteners on 16 to 24 inch centers to a minimum imbed depth of 1 inch. Make sure perimeter is level and shim as necessary.

  • 4.

    Secure top layer of Customizing panels to sleepers layer, adjacent Panels and perimeter blocking with coarse threaded wood screws on 6” staggered centers.

  • 5.

    Sand joints as needed.

  • D.

    Vinyl Finish Floor Installation.

    • 1.

      Finish flooring shall be unrolled and stored on the premises for at least 24 hours before installation commences, or as required for acclimation. The flooring installer will make final determination of acclimation period.

    • 2.

      Vinyl finish flooring shall be installed in accordance with manufacturers recommended instructions and procedures.

  • E.

    Vented Cove Base Installation.

    • 1.

      Install Vented Cove Base per manufacturer’s recommended procedures

    • 3.4

      CLEANING AND PROTECTION

      • A.

        Vinyl Flooring: Protect dance floor assemblies during remainder of

construction period to allow sealer to cure and to ensure that flooring and finish are without damage or deterioration at time of Substantial Completion

  • 1.

    Immediately after vinyl dance floor installation, remove excess adhesive, seam sealer, and other surface blemishes using cleaner recommended by dance floor manufacturer

  • 2.

    Do not cover floors until seam sealer reaches full cure, and not before two days after finishing installation.

  • 3.

    Do not move heavy and sharp objects directly over dance floors.

  • 4.

    Protect installed dance floors to comply with CRI 104, Section 16,

“Protection of Indoor Installations.”

B. Remove all unused materials and debris, and leave premises in clean and orderly condition, ready for final inspection.

END OF SECTION 09646

Specialty Dance / Performance Floor Assemblies

Section 09646

Document info
Document views23
Page views23
Page last viewedSun Dec 11 06:44:32 UTC 2016
Pages8
Paragraphs292
Words2161

Comments