X hits on this document





2 / 5

Cont rom page 1

New Product Line EFR Flowback Division:

Cont on page 2

Eastern’s basic Flowback systems consist of the following components:

  • 1.

    10k, WP, 5- valve skid mount manifolds with 2 inline chokes. We have 2 types - nor- mal service and corrosive service.

  • 2.

    10k, WP, ESD inline safety valves with remote shutdown.

  • 3.

    We have two different styles of flowback tanks. Conventional System 400 BBL tank with two horizontal separators. The newest system 400 BBL tank with one horizon- tal separator & one vertical 125# WP two phase separator.

  • 4.

    Enardo type (flame detonator) is used prior to flare.

  • 5.

    Trailer mounted flarestack (50’ X 6” ) comes complete with auto ignition of pilot

flare ring and its own propane source for pilot and ignition system.

6. 7. 8.

2” 1502 hammer union high pressure flow line pipe rated for 10k WP. 2” 1502 hammer union high pressure target tees and cushioned 90 degree ells. 4” figure 200 hammer unions used for tying in flare system.

EFR flowing capabilities on our modern flowback system can move 2000 BBLS to 3500 BBLS of fluid daily and upwards of 12 million cubic ft of gas daily at flow pressures of 100 PSI. We currently have 7 systems in operation. We are in the planning stages of building a 7500 sq ft office complex to house our Flowback Division at our main facility in Laurel, Mississippi. We have 5 Flowback Supervisors and will be hiring a District Manager and office staff within next the 60 days to complete the initial growth of EFR Flowback. Please consider EFR on your next flowback and or clean up job.

By: Nick Welch

Page 2

Document info
Document views3
Page views3
Page last viewedSun Jan 17 16:17:04 UTC 2016