X hits on this document

47 views

0 shares

0 downloads

0 comments

3 / 14

4.

Product Data for Credit IEQ 4.1:  For adhesives used to laminate gypsum board panels to substrates, documentation including printed statement of VOC content.

5.

Laboratory Test Reports for Credit IEQ 4:  For adhesives used to laminate gypsum board panels to substrates, documentation indicating that products comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

D.

Shop Drawings:

1.

Indicate layout of radiation-protected areas.

2.

Indicate details, dimensions, finishes, and interface with adjoining work.

3.

Indicate lead thickness or lead equivalencies of components.

E.

Initial Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns.

F.

Verification Samples:  For each finish product specified, two samples, minimum size 6 inches (152 mm) square, representing actual product, color, and patterns.

1.6

INFORMATIONAL SUBMITTALS

A.

Manufacturer’s Certificates:

1.

Certificate that leaded glazing capabilities meet or exceed specified requirements.

2.

Certificate of compliance with applicable provisions of the National Council of Radiation Protection (NCRP).

B.

Manufacturer's Instructions:  

1.

Preparation and installation instructions and recommendations.

2.

Storage and handling requirements and recommendations.

C.

Qualification Statements:  

1.

Manufacturer.

2.

Installer.

3.

X-ray physicist.

1.7

CLOSEOUT SUBMITTALS

A.

Maintenance Data:  Cleaning instructions for leaded and acrylic glass.

B.

Record Documentation:  Record Drawings, with dimensions, showing locations of radiation protection.

C.

Radiation Protection Survey:  Record copy of physicist’s Radiation Protection Survey indicating measurements and evaluation of measurements of installed radiation shielding materials.

D.

Manufacturer’s Certification:  Upon completion of radiation protection work, Manufacturer and Installer shall furnish a certificate of compliance that all materials are in accordance with the specifications and physicist’s radiation protection survey.

1.8

QUALITY ASSURANCE

A.

Manufacturer Qualifications: Company with minimum of five (5) years successful experience specializing in manufacturing radiation protection products similar to those specified in the section.

B.

Installer Qualifications:  Company specializing in performing the work of this section with minimum five (5) years documented experience.

RADIATION PROTECTION13 49 00 - 3

Document info
Document views47
Page views47
Page last viewedTue Dec 06 22:40:44 UTC 2016
Pages14
Paragraphs708
Words5391

Comments